Post Works Report Checklist

A post-work report is a report that records the success and failure of a project and enlists a detailed record of the schedule and budget involved. The report also includes a description of things that went wrong, remedial actions, and suggestions for improvement. The report basically looks at cost, time, and product, which are the three vital factors in a construction project. It is usually prepared by the Project Manager and can also be utilized for future projects.

General
Is relevant paperwork available?
Is correct material available?
Is the job information available by the supervisor?
Is the material of optimum quality?
Are correct tools and equipment available?
Is site-specific PPE being used?
Is there a sufficient time frame allotted to tasks?
Are all required documents been signed on?
Are tasks being carried out as per RAMS?
Is housekeeping good?
Is the quality of installation acceptable?
Has the asbestos report been referred to before commencement of work?
Are test results recorded?
Are pictures recorded for office use?
Is a helper available?
Is the worker able to carry out required tasks?
Is the helper aware of safety standards?
Is general development acceptable?
Is housekeeping good?
Is behavior on-site acceptable?
Signature

Edit & customize templates as per your needs in simple steps

Pulse allows you to edit the checklists from the library to suit your specific needs. With our smart checklist builder and editor, you can infuse logic in your questions for more clarity and better visibility.

SIGN UP TO EDIT TEMPLATES

Digitize your existing templates in simple steps

Pulse helps you convert your existing inspection templates into digital ones. Simply upload them in PDF, Excel and Word format and leave the rest for our support team. We will get back to you with digital forms.