Maintenance RPE Equipment Log Checklist

In industries where employees work in hazardous environments wearing Respiratory protective equipment (RPE), regular RPE maintenance is required. This is crucial because a faulty RPE can cause severe health issues for the workers and can be fatal too in some cases. Employees are trained to wear RPE and to manage it, but a regular inspection ensures that there are no loopholes in managing RPEs.

General
Type of change
Describe the change
Document of MOC
Is the environment department notified?
Is there a need to increase the production limits on ECA permits?
Is spill possible due to change?
Are fire accidents possible due to change?
Is there involvement of flammables or combustibles in the change process?
Is there involvement of acids, corrosives or alkalies in the change process?
Is there involvement of designated substances in the change process?
Is there an increase in the number of chemicals or metals used?
Is substance notification requirements, NPRI, Spill plan verified?
Is waste generated recyclable?
Does the change produce any hazardous wastes or by-products?
Types of wastes produced
Are additional waste bins needed?
Is energy usage increased?
Type of energy
Number of extra waste bins needed
The equipment energy saving ratings
Any other equipment which is more energy efficient
Is addition to the environmental aspects list needed?
Is addition to the significant environmental aspects list needed?
Is there a need of a controlled environment?
Is the change documented?
Does the change exhaust to outside?
Exhaust number/stack
Is there a need for an exhaust system or air scrubber?
Does it affect Environmental Legislation?
Is there a pre-requisite for the change?
Are permits/certificates or testing necessary before implementation?
Is there a need for industrial hygiene testing for air, noise, or vibration?
Measure internal noise
Is there an ESA sticker on electrical equipment?
Has the engineer completed all pre-start safety reviews?
Are all non-conformances corrected?
Has the line engineer completed the ergonomic design checklist?
Has the engineer completed hazard assessment/risk assessment?
Do all equipment abide by regulations for industrial establishments?
Are lock-out / tag-out signs posted?
Is identification and labeling of lock-out points done?
Is filling of operator instruction sheets done?
Is filling of pre-use inspection sheets done?
Are additional specific procedures required?
Are additional emergency responses required?
Are additional postings required?
Are additional PPE required?
Additional PPE
Describe the update needed for the EEHS training plan for this change
Sign off
Comments
Auditor name
Auditor signature
Date

Edit & customize templates as per your needs in simple steps

Pulse allows you to edit the checklists from the library to suit your specific needs. With our smart checklist builder and editor, you can infuse logic in your questions for more clarity and better visibility.

SIGN UP TO EDIT TEMPLATES

Digitize your existing templates in simple steps

Pulse helps you convert your existing inspection templates into digital ones. Simply upload them in PDF, Excel and Word format and leave the rest for our support team. We will get back to you with digital forms.