Drying Cabinet Post Installation Quality Inspection Checklist

The inspection covers various aspects of installation like any visible damage, leveling, visual checks, electrical connection, and exhaust function, etc. It is conducted after the installation and before the use of the equipment. It ensures that all the various cabinets are installed without any flaws or deficiencies.

Final acceptance
Does the installation meet standards?
Are all surfaces clean and polished?
Additional comments on general inspection
Recommendations
Signature
General
Add photo of load site
Add photos of unload side
Is visual inspection done?
Is there damage to the unit?
Add photos of the damage, if yes
Are units placed per drawing as per specification?
Are the units leveled?
Is an experienced person assigned for the repair of damages?
Is Seismic anchoring performed as directed?
Are doors inspected for alignment?
Is the door latch working properly?
Is there any binding during open and close?
Add pictures of damage or repair required
Inspection of panels and trim
Are all panels and trims installed in the right manner?
Are all components well installed?
Utilities
Is exhaust connected in the right manner?
Are HEPA and pre-filters installed?
Is electrical connection in the right manner?
Is the power cord routed properly?
Is there a manual disconnect for non plug units?

Edit & customize templates as per your needs in simple steps

Pulse allows you to edit the checklists from the library to suit your specific needs. With our smart checklist builder and editor, you can infuse logic in your questions for more clarity and better visibility.

SIGN UP TO EDIT TEMPLATES

Digitize your existing templates in simple steps

Pulse helps you convert your existing inspection templates into digital ones. Simply upload them in PDF, Excel and Word format and leave the rest for our support team. We will get back to you with digital forms.