Fire Safety Drill - Petrol King Checklist

Construction & Infrastructure

Compliance
Is the daily equipment checklist completed and all equipment in working order?
Water Deployment Drill
Close suction hose valve within 5 seconds (record actual if NO).
Open pressure hose valve within 5 seconds (record actual if NO).
Open main tank supply valve within 5 seconds (record actual if NO).
Open fuel valve within 5 seconds (record actual if NO).
Prime fuel within 5 seconds (record actual if NO).
Apply choke within 5 seconds (record actual if NO).
Set throttle to start position within 5 seconds (record actual if NO).
Switch engine ON within 5 seconds (record actual if NO).
Pull start engine within 30 seconds (record actual if NO).
Gradually close choke within 5 seconds (record actual if NO).
Increase throttle as needed within 5 seconds (record actual if NO).
Roll out pressure hose within 30 seconds (record actual if NO).
Engage nozzle within 5 seconds (record actual if NO).
Are 6x Fire Beaters available?
Are 4x Rake Hoes available?
Are 4x Backpack Pumps available?
Water Retraction Drill
Disengage nozzle within 5 seconds (record actual if NO).
Throttle down within 10 seconds (record actual if NO).
Switch engine OFF within 5 seconds (record actual if NO).
Close fuel valve within 5 seconds (record actual if NO).
Open nozzle, release pressure, and close within 5 seconds (record actual if NO).
Reel up pressure hose within 120 seconds (record actual if NO).

Edit & customize templates as per your needs in simple steps

Pulse allows you to edit the checklists from the library to suit your specific needs. With our smart checklist builder and editor, you can infuse logic in your questions for more clarity and better visibility.

SIGN UP TO EDIT TEMPLATES

Digitize your existing templates in simple steps

Pulse helps you convert your existing inspection templates into digital ones. Simply upload them in PDF, Excel and Word format and leave the rest for our support team. We will get back to you with digital forms.